Milestone 5: Lab complete
HPE Networking Data Center Director
This is Milestone 5 — well done!
This is the final milestone. Thank you for working through the lab — the instructor will close with a summary and take any final questions from the group.
What you have covered in this lab
✅ Section 1 — Explored a live blueprint: examined the fabric topology in Data Center Director
✅ Section 2 — Expanded the fabric: added a new rack, created an Analytics VRF, and built two virtual networks
✅ Section 3 — Connected the analytics service: added a server with redundant links and applied connectivity templates to attach it to both networks
✅ Section 4 — Configured external peering: created and assigned a connectivity template for BGP peering
✅ Section 5 — Explored rollback: reviewed how Time Voyager stages an earlier fabric state for inspection
✅ Section 6 — Explored Data Center Assurance: reviewed fabric health, anomalies, predictions, and application traffic
The bigger picture
Every section in this lab has illustrated the same underlying principle: moving away from manually managing individual devices can give you more time to focus on what matters.
Data Center Director helps teams manage the fabric through intent. Data Center Assurance brings together telemetry and network context to support investigation and resolution. Neither replaces engineering expertise, but both can reduce time spent on repetitive work.
Continuing after this session
Access to the Data Center Assurance demo environment ends after this session. Let us know if you want to investigate the solutions further and we will make that happen!
For further reading, visit Data Center Director documentation.